logo
ProjectClosed

Highway 45 Utility Relocation

Closed · Arkansas · Last reported Mar 2024

Source: Dodge USA

The project includes approximately 15,900 linear feet of water line from 6 to 24 inches in diameter and 5,400 linear feet of sanitary sewer line from 8 to 15 inches in diameter to facilitate the construction of Hwy. 71 - Hwy. 255, (Ft. Smith)(S), Route 45 by the Arkansas Department of Transportation, Job No. 040713. Pipe lines will be installed by conventional open cut trenching and dry bore encas

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Road, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT)
Location
Fort Smith, Arkansas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Highway 45 Utility Relocation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Highway 45 Utility Relocation” is an infrastructure initiative in the Water Supply and Storage sector, located in Fort Smith, Arkansas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project includes approximately 15,900 linear feet of water line from 6 to 24 inches in diameter and 5,400 linear feet of sanitary sewer line from 8 to 15 inches in diameter to facilitate the construction of Hwy. 71 - Hwy. 255, (Ft. Smith)(S), Route 45 by the Arkansas Department of Transportation, Job No. 040713. Pipe lines will be installed by conventional open cut trenching and dry bore encasement pipe.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Arkansas

City

Fort Smith

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Road, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT)

Article published date

2024-03-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project