logo

Highway 5 - Box Canyon Chain-Up and Chain-Off Project

Sector: Automotive • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Completed

The scope of work includes increasing the capacity of the existing chain-up area from 6 trucks to 63 trucks (or storage for 120 trucks) and constructing a new chain-off area approximately 6 km north of the chain-up area at the summit of the hill for up to 15 trucks. The project includes a number of safety improvements such as upgrading an existing 90 km/h curve to 110 km/h consistent with the desi

Project Information FAQ

Project Information

5 Q
The project “Highway 5 - Box Canyon Chain-Up and Chain-Off Project” is an infrastructure initiative in the Automotive sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The scope of work includes increasing the capacity of the existing chain-up area from 6 trucks to 63 trucks (or storage for 120 trucks) and constructing a new chain-off area approximately 6 km north of the chain-up area at the summit of the hill for up to 15 trucks. The project includes a number of safety improvements such as upgrading an existing 90 km/h curve to 110 km/h consistent with the design standard for the corridor, addressing substandard cross-fall, upgrading a substandard runaway lane, upgrading a substandard exit ramp/deceleration lane, improving 2 turn-a-rounds that do not meet design criteria and increasing the shoulder width to 3 meters to allow vehicles to park out of traffic when they are queued up waiting to access the chain-up and chain-off areas.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data