Highway 52 Culvert Replacement
Sector: Water Supply and Storage • Location: Yorkton, Saskatchewan, Canada
Source: Dodge USA
The intent of the bid call is to obtain an offer to perform the work to decommission the existing 40m x 1,050mm Corrugated Steel Pipe (CSP), and supply and install a new 40m x 1,200mm smooth wall steel pipe (SWSP) using boring methods through Highway 52.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Steel, Waste Processing and Treatment, Government, Metal, Commercial
- Location
- Yorkton, Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Highway 52 Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The intent of the bid call is to obtain an offer to perform the work to decommission the existing 40m x 1,050mm Corrugated Steel Pipe (CSP), and supply and install a new 40m x 1,200mm smooth wall steel pipe (SWSP) using boring methods through Highway 52. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Saskatchewan |
City | Yorkton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Steel, Waste Processing and Treatment, Government, Metal, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
