logo
ProjectClosed

Highway 6 Roundabout

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

construction services in connection with its anticipated Highway 6 Roundabout Project The work to be performed generally includes: approximately; 4908 SY of asphalt removal, 2880 LF of asphalt sawing, 589 CY of excavation, 1150 CY of embankment, 2203 tons of Class 6 aggregate base course, 1393 tons of asphalt paving, 1128 SY of concrete pavement, 797 LF of reinforced concrete pipe, 7 storm inlets,

Status
Closed
Sector
Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial
Location
Avon, Colorado, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Highway 6 Roundabout

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Highway 6 Roundabout” is an infrastructure initiative in the Water Supply and Storage sector, located in Avon, Colorado, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

construction services in connection with its anticipated Highway 6 Roundabout Project The work to be performed generally includes: approximately; 4908 SY of asphalt removal, 2880 LF of asphalt sawing, 589 CY of excavation, 1150 CY of embankment, 2203 tons of Class 6 aggregate base course, 1393 tons of asphalt paving, 1128 SY of concrete pavement, 797 LF of reinforced concrete pipe, 7 storm inlets, 452 SY of concrete sidewalk/ramps, 3215 LF of concrete curb/gutter, 8 street lights and 302 SF o...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Colorado

City

Avon

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial

Article published date

2024-07-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project