logo

Highway 80 Trunk Line Phase 2-B Rehabilitation

Sector: Water Supply and Storage • Location: Meridian, Mississippi, United States of America

Source: Dodge

Project
Closed

The Project includes, but may not be limited to, the following Work: Installation of approximately 4,760 linear feet of 24-inch diameter gravity sewer main and manholes, cured in place pipe lining of approximately 625 linear feet of existing 24-inch diameter gravity sewer, casing pipe, temporary bypass pumping, abandonment of existing 24- inch diameter gravity sewer pipe, and restoration.

Status
Closed
Sector
Water Supply and Storage, Government, Road, Waste Processing and Treatment, Commercial
Location
Meridian, Mississippi, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Highway 80 Trunk Line Phase 2-B Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Highway 80 Trunk Line Phase 2-B Rehabilitation” is an infrastructure initiative in the Water Supply and Storage sector, located in Meridian, Mississippi, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project includes, but may not be limited to, the following Work: Installation of approximately 4,760 linear feet of 24-inch diameter gravity sewer main and manholes, cured in place pipe lining of approximately 625 linear feet of existing 24-inch diameter gravity sewer, casing pipe, temporary bypass pumping, abandonment of existing 24- inch diameter gravity sewer pipe, and restoration.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Mississippi

City

Meridian

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Road, Waste Processing and Treatment, Commercial

Article published date

2025-01-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project