Highway 80 Trunk Line Phase 2-B Rehabilitation
Sector: Water Supply and Storage • Location: Meridian, Mississippi, United States of America
Source: Dodge
The Project includes, but may not be limited to, the following Work: Installation of approximately 4,760 linear feet of 24-inch diameter gravity sewer main and manholes, cured in place pipe lining of approximately 625 linear feet of existing 24-inch diameter gravity sewer, casing pipe, temporary bypass pumping, abandonment of existing 24- inch diameter gravity sewer pipe, and restoration.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Road, Waste Processing and Treatment, Commercial
- Location
- Meridian, Mississippi, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Highway 80 Trunk Line Phase 2-B Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes, but may not be limited to, the following Work: Installation of approximately 4,760 linear feet of 24-inch diameter gravity sewer main and manholes, cured in place pipe lining of approximately 625 linear feet of existing 24-inch diameter gravity sewer, casing pipe, temporary bypass pumping, abandonment of existing 24- inch diameter gravity sewer pipe, and restoration. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Meridian |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Waste Processing and Treatment, Commercial |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
