Highway 85 Road Repair from Cheyenne Crossing to Wyoming Line
Sector: Road • Location: South Dakota, United States
Source: KOTA Territory News
A road repair project on U.S. Highway 85 in Lawrence County along a 16-mile stretch between Cheyenne Crossing and the Wyoming state line began May 19 and is expected to continue through June 2. Traffic will be guided by flaggers and pilot cars during working hours with possible delays up to 15 minutes.
- Status
- Under Construction
- Sector
- Road
- Location
- South Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- KOTA Territory News
ConstructChat
Ask ConstructChat about Highway 85 Road Repair from Cheyenne Crossing to Wyoming Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A road repair project on U.S. Highway 85 in Lawrence County along a 16-mile stretch between Cheyenne Crossing and the Wyoming state line began May 19 and is expected to continue through June 2. Traffic will be guided by flaggers and pilot cars during working hours with possible delays up to 15 minutes. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | South Dakota |
Source
Source | KOTA Territory News |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-05-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
