Highway 89 - Double Surface Treatment
Bid results · Ontario · Last reported May 2023
Source: Dodge USA
The Corporation of the Township of Essa invites quotations from qualified contractors to provide all labour, materials, and equipment to complete all works associated with Double Surface Treatment on the 9 Line-- from 5 Sideroad to Highway 89 (3KM), 11th line from County Road 21 heading north 1.5 KM towards 20th Sideroad (1.5KM), and 11th line from 5th Sideroad to Highway 89 (2KM)
- Status
- Closed
- Sector
- Road, Government, Commercial
- Location
- Utopia, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Highway 89 - Double Surface Treatment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Corporation of the Township of Essa invites quotations from qualified contractors to provide all labour, materials, and equipment to complete all works associated with Double Surface Treatment on the 9 Line-- from 5 Sideroad to Highway 89 (3KM), 11th line from County Road 21 heading north 1.5 KM towards 20th Sideroad (1.5KM), and 11th line from 5th Sideroad to Highway 89 (2KM) |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Utopia |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
