logo

Highway 99 First Avenue South Bridge Deck Panel Replacement

Sector: Bridge • Location: Seattle, Washington, United States

Source: The Seattle Times

Project
Under Construction

Replacement of nine steel deck panels on the northbound Highway 99 First Avenue South drawbridge in Seattle, Washington. The bridge will be closed during the weekend for the work, with additional night or weekend closures possible.

Status
Under Construction
Sector
Bridge, Steel, Rail
Location
Seattle, Washington, United States of America
Updated
22 Jul 2026
Source
The Seattle Times

ConstructChat

Ask ConstructChat about Highway 99 First Avenue South Bridge Deck Panel Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Highway 99 First Avenue South Bridge Deck Panel Replacement” is an infrastructure initiative in the Bridge sector, located in Seattle, Washington, United States. Taiyo aggregates data on it from The Seattle Times.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replacement of nine steel deck panels on the northbound Highway 99 First Avenue South drawbridge in Seattle, Washington. The bridge will be closed during the weekend for the work, with additional night or weekend closures possible.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Washington

City

Seattle

Source

Source

The Seattle Times

URL

More Details

Record type

Project

Sector

Bridge, Steel, Rail

Article published date

2026-05-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project