Highway Culvert Installers
Closed · Wisconsin · Last reported Mar 2024
Source: Dodge USA
Replacement of a 16 bridge on 120th Ave. Bridge location mile east of intersection at 120th Ave. and State Highway 40 Town of Howard, Chippewa County WI. Bridge to be removed and replaced with 12 span x 4 rise x 40 long poured or precast box culvert. Culvert must meet load resistance factor design HL93 loading.
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Road, Waste Processing and Treatment, Government, Commercial
- Location
- Kenosha, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Highway Culvert Installers
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replacement of a 16 bridge on 120th Ave. Bridge location mile east of intersection at 120th Ave. and State Highway 40 Town of Howard, Chippewa County WI. Bridge to be removed and replaced with 12 span x 4 rise x 40 long poured or precast box culvert. Culvert must meet load resistance factor design HL93 loading. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Kenosha |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
