HIGHWAY ENGINEERING
Sector: Road • Location: Ghana
Source: World Bank Group
The project consists of detailed engineering and preparation of bid documents by consultants for new alignments of two main roads: (a) Accra-Kumasi - 128 miles; and (b) Takoradi-Kumasi (part) - 107 miles. The total cost is estimated at US$2.2 million equivalent, of which the foreign exchange component to be financed under the proposed credit is about US$1.5 million. The area served by the project
- Status
- Closed
- Sector
- Road, Government
- Location
- Ghana
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about HIGHWAY ENGINEERING
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of detailed engineering and preparation of bid documents by consultants for new alignments of two main roads: (a) Accra-Kumasi - 128 miles; and (b) Takoradi-Kumasi (part) - 107 miles. The total cost is estimated at US$2.2 million equivalent, of which the foreign exchange component to be financed under the proposed credit is about US$1.5 million. The area served by the project roads contains over 60 per cent of the population, including the three largest urban areas of Accra/Tema, Kumasi and Takoradi/Sekondi and has the greatest potential for future economic growth. |
Original sector | Transportation |
Location
Country | Ghana |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Ghana
- Establishment of Commercial Poultry Farm
- Ghana - Road Infrastructure Project (Eastern and Western Regions)
- F. A. Brands Limited
- Establishment of an ultra-modern vegetable processing centre
- Establishment of a Shea Processing factory
- Production of Fruit Juices
- Takoradi 3 Power Plant
- Expansion of a Quarry and Construction Business
