logo

HIGHWAY MAINTENANCE

Sector: Road • Location: Bolivia

Source: World Bank Group

Project
Closed

The project seeks to improve road maintenance in Bolivia by: (a) carrying out required road maintenance, including deferred maintenance, in the districts of La Paz, Cochabama and Santa Cruz; (b) providing the necessary equipment, vehicles, tools and spare parts; (c) strengthening the National Highway Service; and (d) preparing a country-wide highway maintenance, rehabilitation and upgrading progra

Project Information FAQ

Project Information

5 Q
The project “HIGHWAY MAINTENANCE” is an infrastructure initiative in the Road sector, located in Bolivia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project seeks to improve road maintenance in Bolivia by: (a) carrying out required road maintenance, including deferred maintenance, in the districts of La Paz, Cochabama and Santa Cruz; (b) providing the necessary equipment, vehicles, tools and spare parts; (c) strengthening the National Highway Service; and (d) preparing a country-wide highway maintenance, rehabilitation and upgrading program. It includes the acquisition of equipment, spare parts, workshop tools and equipment, hand tools for labor intensive maintenance, and the provision of consulting services for technical assistance and engineering and economic studies. Project benefits consist of 12% average reduction of vehicle operating costs; not quantified benefits are reduced passenger time and accidents, and prevented economic loss by avoidance of road closures. The project faces no special risks, although realization of all the benefits will depend on the progressive raising of the beneficiary's efficiency.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data