logo

Highway Z Transmission Main Phase 1

Sector: Metal • Location: O'Fallon, Missouri, United States of America

Source: Dodge USA

Project
Closed

The Contractor will be required to construct 8,700 linear feet of 16 ductile iron pipe water transmission main. The project contains a connection to an existing 16 main at the Highway Z and N intersection thence south to the District s pump station located east of Highway Z. The design includes careful planning to avoid existing utilities and coordinating with utility providers to aid in minimizin

Status
Closed
Sector
Metal, Water Supply and Storage, Power Transmission, Road, Government, Steel, Commercial, Power Generation (CCGT)
Location
O'Fallon, Missouri, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Highway Z Transmission Main Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Highway Z Transmission Main Phase 1” is an infrastructure initiative in the Metal sector, located in O'Fallon, Missouri, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Contractor will be required to construct 8,700 linear feet of 16 ductile iron pipe water transmission main. The project contains a connection to an existing 16 main at the Highway Z and N intersection thence south to the District s pump station located east of Highway Z. The design includes careful planning to avoid existing utilities and coordinating with utility providers to aid in minimizing impact to adjacent properties. The design also includes thrust block sizing and restrained join...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Missouri

City

O'Fallon

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Metal, Water Supply and Storage, Power Transmission, Road, Government, Steel, Commercial, Power Generation (CCGT)

Article published date

2024-07-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project