logo

HIGHWAY

Sector: Road • Location: Latvia

Source: World Bank Group

Project
Closed

The overall objective of the Highway Project will be to preserve the Latvian road network and minimize total road transport costs. The specific objectives of the project are to: a) expand the periodic maintenance level where economically justified; b) improve road maintenance efficiency and quality by introducing improved technology and quality control and increasing the Latvian Road Administratio

Project Information FAQ

Project Information

5 Q
The project “HIGHWAY” is an infrastructure initiative in the Road sector, located in Latvia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The overall objective of the Highway Project will be to preserve the Latvian road network and minimize total road transport costs. The specific objectives of the project are to: a) expand the periodic maintenance level where economically justified; b) improve road maintenance efficiency and quality by introducing improved technology and quality control and increasing the Latvian Road Administration's cost consciousness and economic justification capabilities; c) support the development of private road construction and engineering industries; d) improve road safety conditions; and e) establish the funding mechanism and level required to achieve minimum total road transport cost. The main components of the project are: a) periodic road maintenance; b) bridge repair and reconstruction; c) road safety improvement; d) gravel road maintenance and low cost bitumenization techniques; e) equipment for the central laboratory; and f) institutional strengthening.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data