HIGHWAYS II
Closed · Kenya
Source: World Bank Group
The proposed project consists of (i) the reconstruction of eleven sections of trunk roads (285 miles) including design and supervision and replacement of ten single-lane bridges by two-lane structures, (ii) the detailed engineering of fourteen secondary/feeder roads (266 miles), and (iii) provision of specialists for a staff training scheme designed to train Kenyans for senior executive positions
- Status
- Closed
- Sector
- Road, Rail, Hotel, Raw Materials, Government
- Location
- Kenya
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about HIGHWAYS II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project consists of (i) the reconstruction of eleven sections of trunk roads (285 miles) including design and supervision and replacement of ten single-lane bridges by two-lane structures, (ii) the detailed engineering of fourteen secondary/feeder roads (266 miles), and (iii) provision of specialists for a staff training scheme designed to train Kenyans for senior executive positions in the Ministry of Works. The roads included in the project are important links in the country's highway network. They are fairly widely dispersed through the more populated and productive areas and will serve important agricultural and tourist centers. |
Original sector | Transportation |
Location
Country | Kenya |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Rail, Hotel, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Kenya
- Lake Turkana Wind Power Project Loyangalani
- Acquisition of equipment and Facilities for expansion of hospitality project
- DEVELOPMENT OF LOWER TURKWEL IRRIGATION PROJECT UNDER SUGARCANE PRODUCTION
- Manufacture of Rapid Diagnostic Test Kits
- SOLAR POWER GENERATION PROJECT
- Ewaso Ng'iro Tannery and Leather Factory
- Oserian Two Lakes Industrial Park
- Bamboo Commercialization
