HIGHWAYS (SUPPLEMENT
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The original project, for which the existing highway credit (No. 48-TA) was made, consisted of the detailed engineering and construction of eight major roads, totalling 734 miles. The proposed revised project, which both the existing credit and this proposed supplementary credit would help to finance, consists of: (1) the detailed engineering and construction of six of the original eight roads, to
- Status
- Closed
- Sector
- Road, Government
- Location
- Tanzania
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about HIGHWAYS (SUPPLEMENT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The original project, for which the existing highway credit (No. 48-TA) was made, consisted of the detailed engineering and construction of eight major roads, totalling 734 miles. The proposed revised project, which both the existing credit and this proposed supplementary credit would help to finance, consists of: (1) the detailed engineering and construction of six of the original eight roads, totalling 533 miles; (2) the detailed engineering of a 142 mile section of the main road to the Zambia border from Dar es Salaam; (3) the detailed engineering of feeder roads totalling about 210 miles in the Geita Peninsula area; and (4) a staffing and training program in the Roads and Aerodromes Division of the Ministry of Communications, Labour and Works. |
Original sector | Transportation |
Location
Country | Tanzania |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Tanzania
- Open for FDI through a minority stake/Development of a new project/Processing and preserving of fish and fish products/BLUE PROCESSING COMPANY .LTD
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of made-up textile articles, except apparel/GSM FOAM CO LTD
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of plastics products/Jafnob Printing and Packaging Ltd
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of basic iron and steel/Quaim Steel Mills Ltd
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of articles of concrete, cement and plaster/Lake Group (Premix)
- Open for FDI through a majority stake/Purchase of new machinery and equipment/Manufacture of machinery for food, beverage and tobacco processing/Tall Welding & Fabrications
- Dar es Salaam Water Distribution
- Kahama Mining Corp. Ltd.
