logo

Hijaunesia Program GCL Solar Subprojects

Source: Asian Development Bank (ADB)

Project

Gajahmungkur Floating Solar Project: 100MWac floating solar PV plant to be built on the surface of the Gajahmungkur reservoir, Wonogiri Regency, Central Java which is currently used by a hydroelectric power plant owned by Perum Jasa Tirta I, one of the Sponsors of Gajahmungkur Floating Solar Project. The total surface area required for development is 250 hectares. The transmission line for Gajahmu

Project Information FAQ

Project Information

5 Q
The project "Hijaunesia Program GCL Solar Subprojects" is an infrastructure initiative in the Water Supply and Storage, Solar, Power Generation (CCGT), Commercial, Government sector, located in N/A, Indonesia. Taiyo aggregates data from Asian Development Bank (ADB), including information on sponsoring government bodies, EPCs, and contractors.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Gajahmungkur Floating Solar Project: 100MWac floating solar PV plant to be built on the surface of the Gajahmungkur reservoir, Wonogiri Regency, Central Java which is currently used by a hydroelectric power plant owned by Perum Jasa Tirta I, one of the Sponsors of Gajahmungkur Floating Solar Project. The total surface area required for development is 250 hectares. The transmission line for Gajahmungkur floating solar PV plant is connected to Nguntoronadi 150 kV Substation. The distance to the nearest switchyard is approximately 11.7 kilometers from the floating PV site.Banyuwangi Ground-Mounted Solar Project: 100MWac ground mounted solar PV plant to be built in Banyuwangi Regency, East Java. The transmission line for the Banyuwangi PV plant is connected to Banyuwangi 150 kV Substation. The distance to the nearest switchyard is approximately 4 kilometers from the PV site.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data