logo
Project

Hijaunesia Program GCL Solar Subprojects

Sector: Water Supply and Storage • Location: Indonesia

Source: Asian Development Bank (ADB)

Gajahmungkur Floating Solar Project: 100MWac floating solar PV plant to be built on the surface of the Gajahmungkur reservoir, Wonogiri Regency, Central Java which is currently used by a hydroelectric power plant owned by Perum Jasa Tirta I, one of the Sponsors of Gajahmungkur Floating Solar Project. The total surface area required for development is 250 hectares. The transmission line for Gajahmu

Sector
Water Supply and Storage, Solar, Power Generation (CCGT), Commercial, Government
Location
Indonesia
Updated
22 Jul 2026
Source
Asian Development Bank (ADB)

ConstructChat

Ask ConstructChat about Hijaunesia Program GCL Solar Subprojects

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Hijaunesia Program GCL Solar Subprojects” is an infrastructure initiative in the Water Supply and Storage sector, located in Indonesia. Taiyo aggregates data on it from Asian Development Bank (ADB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Gajahmungkur Floating Solar Project: 100MWac floating solar PV plant to be built on the surface of the Gajahmungkur reservoir, Wonogiri Regency, Central Java which is currently used by a hydroelectric power plant owned by Perum Jasa Tirta I, one of the Sponsors of Gajahmungkur Floating Solar Project. The total surface area required for development is 250 hectares. The transmission line for Gajahmungkur floating solar PV plant is connected to Nguntoronadi 150 kV Substation. The distance to the nearest switchyard is approximately 11.7 kilometers from the floating PV site.Banyuwangi Ground-Mounted Solar Project: 100MWac ground mounted solar PV plant to be built in Banyuwangi Regency, East Java. The transmission line for the Banyuwangi PV plant is connected to Banyuwangi 150 kV Substation. The distance to the nearest switchyard is approximately 4 kilometers from the PV site.

Original sector

Energy

Budget

Location

Country

Indonesia

Source

Source

Asian Development Bank (ADB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Solar, Power Generation (CCGT), Commercial, Government

Article published date

2025-09-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project