logo

Hillman Energy Center BESS

Sector: Metal • Location: Tewksbury, Massachusetts, United States

Source: ESS News

Project
Proposed

A proposed 125 MW (ac)/500 MWh lithium iron phosphate (LFP) battery energy storage system by East Point Energy in Tewksbury, Massachusetts, under a 20-year contract.

Status
Prospective
Sector
Metal, Hydro, Energy Storage, Fertilizers, Steel
Location
Tewksbury, Massachusetts, United States of America
Updated
22 Jul 2026
Source
ESS News

ConstructChat

Ask ConstructChat about Hillman Energy Center BESS

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Hillman Energy Center BESS” is an infrastructure initiative in the Metal sector, located in Tewksbury, Massachusetts, United States. Taiyo aggregates data on it from ESS News.

Participants

Not available for this record.

Status

Original status

proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposed 125 MW (ac)/500 MWh lithium iron phosphate (LFP) battery energy storage system by East Point Energy in Tewksbury, Massachusetts, under a 20-year contract.

Original sector

Energy Storage

Location

Country

United States of America (USA)

State

Massachusetts

City

Tewksbury

Source

Source

ESS News

URL

More Details

Record type

Project

Sector

Metal, Hydro, Energy Storage, Fertilizers, Steel

Article published date

2025-09-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project