logo

Hillside & Skyview Reservoir Site Improvements, City Project No. 85270

Sector: Car parking • Location: Burlingame, California, United States of America

Source: City of Burlingame

Project
Closed

City Project No. 85270 This project consisted of improvements at two sites, Skyview Reservoir and Hillside Reservoir. Skyview Reservoir's retaining wall was replaced with a new Allan Block fieldstone retaining wall. Hillside Reservoir gained a second access point to the reservoir to make necessary maintenance repairs. Scope: The City of Burlingame made improvements at Hillside Reservoir on 2832 Hi

Project Information FAQ

Project Information

4 Q
The project “Hillside & Skyview Reservoir Site Improvements, City Project No. 85270” is an infrastructure initiative in the Car parking sector, located in Burlingame, California, United States of America. Taiyo aggregates data on it from City of Burlingame.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

City Project No. 85270 This project consisted of improvements at two sites, Skyview Reservoir and Hillside Reservoir. Skyview Reservoir's retaining wall was replaced with a new Allan Block fieldstone retaining wall. Hillside Reservoir gained a second access point to the reservoir to make necessary maintenance repairs. Scope: The City of Burlingame made improvements at Hillside Reservoir on 2832 Hillside Drive by installing a new concrete driveway and asphalt concrete pavement. The driveway was 25ft long and lead into an asphalt concrete paved parking space approximately 31ft x 14ft. A new 16ft wide gate approximately 20ft from the driveway was installed across a 15ft x 20ft asphalt concrete paved area. The area was encompassed by a fence with a new pedestrian gate. The City of Burlingame reconstructed the Skyview Reservoir retaining wall at 1321 Skyview Drive. A new Allan Block fieldstone retaining wall, approximately 183ft long with a max height of 3ft 4in, tall replaced the current wood retaining wall. About 8 inches of the Allan Block were embedded into the ground as well as approximately 4in of perforated polyvinyl chloride were connected to the solid wall 4in polyvinyl chloride in the sidewalk and to the existing storm drain inlet. In addition, there were approximately 4843 SF of new AC pavement installed. Plan Holders List Bid Summary

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data