Hillview Reservoir Chemical Addition Facilities
Sector: Commercial • Location: New York, United States of America
Source: Dodge USA
The Work under this Contract includes an upgrade of the existing North Entrance, construction of the two new Chemical Addition Facilities CAF buildings CAF-North and CAF-South, two new electrical service feeds and distribution equipment, new flow measurement, a new SCADA system, and interim structures for chemical systems, water quality monitoring systems, and carry water pumps. This Competitive S
- Status
- Under Construction
- Sector
- Commercial, Water Supply and Storage, Power Generation (CCGT), Chemical (Industrial), Manufacturing (Industrial), Waste Processing and Treatment
- Location
- New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hillview Reservoir Chemical Addition Facilities
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work under this Contract includes an upgrade of the existing North Entrance, construction of the two new Chemical Addition Facilities CAF buildings CAF-North and CAF-South, two new electrical service feeds and distribution equipment, new flow measurement, a new SCADA system, and interim structures for chemical systems, water quality monitoring systems, and carry water pumps. This Competitive Sealed Bid RFx is being released through PASSPort, New York Citys online procurement portal - 90-a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Power Generation (CCGT), Chemical (Industrial), Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-07-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
