Hilsa-Simkot Road Project
The owner, status and timeline of this project. A free account opens every field.
Source: The Kathmandu Post
A 96-kilometre road project as part of the Karnali Corridor under the BRI to connect Hilsa and Simkot. The project includes a request for a motorable bridge on the Nepal-China border. Awaiting pre-feasibility study initiation by China.
- Status
- Prospective
- Sector
- Bridge, Road, Government
- Location
- Nepal
- Updated
- 19 Nov 2026
- Source
- The Kathmandu Post
ConstructChat
Ask ConstructChat about Hilsa-Simkot Road Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | A 96-kilometre road project as part of the Karnali Corridor under the BRI to connect Hilsa and Simkot. The project includes a request for a motorable bridge on the Nepal-China border. Awaiting pre-feasibility study initiation by China. |
Original sector | Transportation |
Location
Country | Nepal |
Source
Source | The Kathmandu Post |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Government |
Article published date | 2025-06-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in Nepal
- Himal Power Limited
- Upgrades to Khodpe-Kalinga Bridge (Chainpur) road
- Emergency Flood Damage Rehabilitation Project
- Dharan Bridge Construction
- MFF: Green and Resilience Financing Facility Investment Program
- Trail Bridge Sub-Sector Programme in Nepal
- East-West Highway Expansion Project (Kamala–Dhalkeber–Pathlaiya Road Eastern Section)
- Green and Resilience Financing Facility Investment Program
