Hilton Home2 Suites
Sector: Water Supply and Storage • Location: Oak Harbor, Washington, United States of America
Source: Dodge USA
construct a 102-room Home2 Suites that will include a conference space, a swimming pool and other amenities. The rooms will have full kitchens and living spaces meant for longer stays; south-facing rooms would have views of the water.
- Status
- Prospective
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Hotel, Seaport, Commercial
- Location
- Oak Harbor, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Hilton Home2 Suites
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | construct a 102-room Home2 Suites that will include a conference space, a swimming pool and other amenities. The rooms will have full kitchens and living spaces meant for longer stays; south-facing rooms would have views of the water. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Oak Harbor |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Hotel, Seaport, Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
