HISTORIC FAYETTEVILLE CITY CEMETERY MAINTENANCE IMPROVEMENTS
Sector: Commercial • Location: Fayetteville, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The project will provide pedestrian improvements along State Route 54 within the City of Fayetteville, an existing four lane divided highway. Construction will consist of 5' -0" pedestrian brick paver sidewalk connecting the existing walkways starting at the end of the State Route 54 Connecting Sidewalks Project (CSHPP-0007-00(564)) and continuing east along the northern and southern sides of Hwy.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project will provide pedestrian improvements along State Route 54 within the City of Fayetteville, an existing four lane divided highway. Construction will consist of 5' -0" pedestrian brick paver sidewalk connecting the existing walkways starting at the end of the State Route 54 Connecting Sidewalks Project (CSHPP-0007-00(564)) and continuing east along the northern and southern sides of Hwy. 54. Construction will also include an approximately 5'-0"' height wall (Maximum) with wrought iron fencing along top the city cemetery. The proposed routes are located within a mixed-use area that includes commercial, residential and government facilities. The proposed design speed along the mainline is 35 mph. The project area length along State Route 54 is approximately I,900 linear feet and includes 3,435 linear feet of new brick paver sidewalks. The design matches the existing conditions at the recently completed Lanier Avenue project, including benches and pedestrian lighting. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
