Historic Firestone Waterline Replacement Phase 3
Sector: Water Supply and Storage • Location: Firestone, Colorado, United States of America
Source: Dodge
The base bid utility work is comprised of traditional open cut methodology to install roughly 1800 LF of 8 C900 PVC DR18 waterline. Work includes replacement of existing service lines, meter pits, hydrant installation/replacement; installation of fittings, valves, and other pipeline appurtenances as more specifically defined herein. The base bid surface improvements are comprised of asphalt mill a
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Road, Commercial, Power Transmission, Power Generation (CCGT), Car parking, Manufacturing (Industrial), Automotive
- Location
- Firestone, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Historic Firestone Waterline Replacement Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The base bid utility work is comprised of traditional open cut methodology to install roughly 1800 LF of 8 C900 PVC DR18 waterline. Work includes replacement of existing service lines, meter pits, hydrant installation/replacement; installation of fittings, valves, and other pipeline appurtenances as more specifically defined herein. The base bid surface improvements are comprised of asphalt mill and overlay, full depth asphalt removal and replacement, curb and gutter replacement, sidewalk rep... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Firestone |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Commercial, Power Transmission, Power Generation (CCGT), Car parking, Manufacturing (Industrial), Automotive |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
