logo

Hitachi ABB Power Grids and Aibel confirmed for third phase of Dogger Bank Wind Farm

Sector: Power Generation (CCGT) • Location: United Kingdom

Source: Energy Projects & Technology

Project

Dogger Bank Wind Farm, Aibel and Hitachi ABB Power Grids have won contracts provide the offshore platform and associated transmission link for the third phase of the world’s largest offshore wind farm.  The two suppliers, which were previously appointed as tier-one suppliers for the first two phases of Dogger Bank Wind Farm, are now confirmed for all three phases of the development, Dogger Bank A,

Project Information FAQ

Project Information

3 Q
The project “Hitachi ABB Power Grids and Aibel confirmed for third phase of Dogger Bank Wind Farm” is an infrastructure initiative in the Power Generation (CCGT) sector, located in United Kingdom. Taiyo aggregates data on it from Energy Projects & Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Dogger Bank Wind Farm, Aibel and Hitachi ABB Power Grids have won contracts provide the offshore platform and associated transmission link for the third phase of the world’s largest offshore wind farm.  The two suppliers, which were previously appointed as tier-one suppliers for the first two phases of Dogger Bank Wind Farm, are now confirmed for all three phases of the development, Dogger Bank A, B and C.  Both contracts are subject to financial close on Dogger Bank C, which is currently forecast for Q4 this year.  Dogger Bank Wind Farm has been developed as a joint venture between SSE Renewables and Equinor (50:50), and ENI will take a 20% stake in the first two phases, subject to regulatory and lender approvals of Eni’s agreement to enter the joint venture which is due during Q1 2021.  Dogger Bank Wind Farm Project Director, Steve Wilson, said: “Confirmation of our collaboration with Hitachi ABB Power Grids and Aibel on all three phases of Dogger Bank Wind Farm is another important milestone for our world-leading development. Working together in an integrated way will enable us to achieve optimum efficiency during the design, procurement and construction work, while the use of market-leading HVDC technology will ensure efficient and reliable transmission of renewable energy for 6 million UK households once all of the windfarm phases become operational.” The electricity generated by the turbines at Dogger Bank, which are between 130km and over 200km from shore, will be transmitted onshore via subsea cables. Due to the distance of each of the Dogger Bank phases offshore, it will be the first HVDC connected wind farm in the UK. An HVDC connection will ensure the renewable energy being transmitted over the long distances from the Dogger Bank offshore to the onshore grid connections in East Riding and Teesside, will be achieved efficiently while minimising losses. Hitachi ABB Power Grids will install its compact high-voltage direct-current technology, called HVDC Light®, for efficient transmission to the project’s onshore grid connections in the East Riding of Yorkshire for Dogger Bank A and B, and on Teesside for Dogger Bank C.  Aibel will work alongside Hitachi ABB Power Grids to provide the offshore converter platforms located in the North Sea.  “Together, with customers and partners, we are playing a key role in accelerating the energy transition,” said Niklas Persson, Managing Director of Hitachi ABB Power Grids’ Grid Integration business. “HVDC technology contributes significantly towards a carbon-neutral energy future by enabling the integration of large-scale and remote renewable energy generation,” he added. “Being selected once again underlines our customers’ trust in our world-leading expertise and delivery capabilities.” “Alongside our partner Hitachi ABB Power Grids, our skilled engineers have developed integrated solutions and established an efficient supply chain for our deliveries. We are proud to see that our concept wins in a very competitive environment,” says Executive Vice President for Field Development and Offshore wind in Aibel, Nils Arne Hatleskog. Source: https://www.sserenewables.com/Image source: Courtesy of Aibel Read more Wind power news here

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data