Hive Hydrogen Green Ammonia Project
Planned · Eastern Cape · Last reported May 2026
Source: Bloomberg
Hive Hydrogen South Africa has selected Topsoe A/S to supply about $1 billion in electrolyzer and ammonia synthesizing equipment for its green ammonia project in the Eastern Cape province. The project is scheduled to start up in 2030 and aims to produce a million tons of green ammonia per year, with an expected total cost of more than $5 billion. The project will use an 850-megawatt electrolyzer e
- Status
- Prospective
- Sector
- Hydrogen
- Location
- Eastern Cape, South Africa
- Updated
- 22 Jul 2026
- Source
- Bloomberg
ConstructChat
Ask ConstructChat about Hive Hydrogen Green Ammonia Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Hive Hydrogen South Africa has selected Topsoe A/S to supply about $1 billion in electrolyzer and ammonia synthesizing equipment for its green ammonia project in the Eastern Cape province. The project is scheduled to start up in 2030 and aims to produce a million tons of green ammonia per year, with an expected total cost of more than $5 billion. The project will use an 850-megawatt electrolyzer employing Topsoe's Solid Oxide Electrolyzer Cell technology and is intended to serve export markets such as Japan and South Korea. |
Original sector | Energy |
Budget |
Location
Country | South Africa |
State | Eastern Cape |
Source
Source | Bloomberg |
URL |
More Details
Record type | Project |
Sector | Hydrogen |
Article published date | 2026-05-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
