logo

Hixson Data Center

Sector: Hydrogen • Location: McMinnville, Tennessee, United States

Source: Data Center Dynamics

Project
Under Construction

A 25MW AI data center being built in Warren County, McMinnville, Tennessee. The state-of-the-art AI campus spans 96,065 square ft across two levels, purpose-built for high-density compute workloads and designed to support the Nvidia GB200 NVL72. The site is owned by the developer and will feature on-site Solid Oxide Fuel Cell Power, diesel generator supply, and a 25MW battery energy storage system

Status
Under Construction
Sector
Hydrogen, Energy Storage, Power Generation (CCGT), Water Supply and Storage, Data Center
Location
McMinnville, Tennessee, United States of America
Updated
22 Jul 2026
Source
Data Center Dynamics

ConstructChat

Ask ConstructChat about Hixson Data Center

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Hixson Data Center” is an infrastructure initiative in the Hydrogen sector, located in McMinnville, Tennessee, United States. Taiyo aggregates data on it from Data Center Dynamics.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 25MW AI data center being built in Warren County, McMinnville, Tennessee. The state-of-the-art AI campus spans 96,065 square ft across two levels, purpose-built for high-density compute workloads and designed to support the Nvidia GB200 NVL72. The site is owned by the developer and will feature on-site Solid Oxide Fuel Cell Power, diesel generator supply, and a 25MW battery energy storage system, making it grid-independent. Cooling technologies include direct-to-chip cooling, chilled water air handling units, hot aisle containment, and economizer heat exchangers.

Original sector

Data Center

Location

Country

United States of America (USA)

State

Tennessee

City

McMinnville

Source

Source

Data Center Dynamics

URL

More Details

Record type

Project

Sector

Hydrogen, Energy Storage, Power Generation (CCGT), Water Supply and Storage, Data Center

Article published date

2026-05-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project