H.L.Sonny CA Runway 1/19 Strengthening& Lighting Replace
Closed · Alabama · Last reported Sep 2025
Source: Dodge
Major items of work include the strengthening of Runway 1/19 and the replacement of the Runway Lighting and Guidance Sign Systems the H.L. Sonny Callahan Airport. Approximate quantities include: 1. Asphalt Wearing Surface 9,922 Ton 2. Asphalt Leveling 3,533 Ton 3. Markings 236,260 SF 4. High Intensity Runway Edge Lights 86 EA 5. Guidance Signs 16 EA 6. Removal of Existing Runway Electrical System
- Status
- Closed
- Sector
- Road, Power Generation (CCGT), Airport, Aerospace & Defense, Commercial, Government
- Location
- Fairhope, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about H.L.Sonny CA Runway 1/19 Strengthening& Lighting Replace
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Major items of work include the strengthening of Runway 1/19 and the replacement of the Runway Lighting and Guidance Sign Systems the H.L. Sonny Callahan Airport. Approximate quantities include: 1. Asphalt Wearing Surface 9,922 Ton 2. Asphalt Leveling 3,533 Ton 3. Markings 236,260 SF 4. High Intensity Runway Edge Lights 86 EA 5. Guidance Signs 16 EA 6. Removal of Existing Runway Electrical System 1 LS The project shall be completed within 215 Calendar Days of the Issuance of Notice to Proceed... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Fairhope |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Power Generation (CCGT), Airport, Aerospace & Defense, Commercial, Government |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
