HMA Resurfacing
Sector: Manufacturing (Industrial) • Location: Rockford, Illinois, United States of America
Source: Dodge
Const. Hma Resurfacing, Incl. 744 Ton Hma Sc, Il-9.5, d, n50, 4,000 Lb. Bit. Matl's. (Prime Ct.), 228 s.y. Hma Surf. Rem., Butt Jt., 19 Ton Inc. Hma Surf., Paint Pv't. Mark. Line, Var., Etc. (0.42 Mi.)
- Status
- Closed
- Sector
- Manufacturing (Industrial), Government, Commercial
- Location
- Rockford, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about HMA Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Const. Hma Resurfacing, Incl. 744 Ton Hma Sc, Il-9.5, d, n50, 4,000 Lb. Bit. Matl's. (Prime Ct.), 228 s.y. Hma Surf. Rem., Butt Jt., 19 Ton Inc. Hma Surf., Paint Pv't. Mark. Line, Var., Etc. (0.42 Mi.) |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Rockford |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Government, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
