logo
ProjectBid Results

Hnd Air Traffic Control Tower BLDG Improvements

Bid results · Nevada · Last reported Jul 2025

Source: Dodge

This project involves the renovation and modernization of the FAA Control Tower Building at Henderson Executive Airport (HND) in Henderson, Nevada. The scope includes exterior improvements such as repainting stucco and metal doors to match the existing terminal remodel, replacing all roofing systems, and evaluating the soffit on the tower walkway for possible replacement. Interior upgrades consist

Status
Closed
Sector
Metal, Government, Airport, Commercial, Manufacturing (Industrial)
Location
Henderson, Nevada, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Hnd Air Traffic Control Tower BLDG Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Hnd Air Traffic Control Tower BLDG Improvements” is an infrastructure initiative in the Metal sector, located in Henderson, Nevada, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project involves the renovation and modernization of the FAA Control Tower Building at Henderson Executive Airport (HND) in Henderson, Nevada. The scope includes exterior improvements such as repainting stucco and metal doors to match the existing terminal remodel, replacing all roofing systems, and evaluating the soffit on the tower walkway for possible replacement. Interior upgrades consist of new ceiling tiles, fresh paint, restroom renovations, casework and countertop replacements, n...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Nevada

City

Henderson

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Metal, Government, Airport, Commercial, Manufacturing (Industrial)

Article published date

2025-08-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project