logo

Ho Chi Minh City Environmental Sanitation (Nhieu Loc-Thi Nghe Basin) Project

Sector: Road • Location: Viet Nam

Source: World Bank Group

Project
Closed

The Ho Chi Minh City Environmental Sanitation Project will lead to sustainable improvements in public health, and the well-being of the city's population, through improved reductions in wastewater pollution, and in flood occurrences, as a result of institutional efficiency in the management of drainage, and wastewater services. The two components are: 1) Construction of the Nghie Loc Thi Nghe wast

Project Information FAQ

Project Information

5 Q
The project “Ho Chi Minh City Environmental Sanitation (Nhieu Loc-Thi Nghe Basin) Project” is an infrastructure initiative in the Road sector, located in Viet Nam. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Ho Chi Minh City Environmental Sanitation Project will lead to sustainable improvements in public health, and the well-being of the city's population, through improved reductions in wastewater pollution, and in flood occurrences, as a result of institutional efficiency in the management of drainage, and wastewater services. The two components are: 1) Construction of the Nghie Loc Thi Nghe wastewater interceptor, to divert dry weather wastewater flows to the screening/pumping facility. In addition, combined sewer overflow structures will divert wastewater flows into the interceptor during dry weather. However, to mitigate the accumulated, odorous waters from the canal during rising tides, a canal flushing mechanism will be installed, drawing canal waters to the sewage interceptor, through withdrawal chambers located in the canal embankment, operated through automatic modes controlled from the pumping station. This pumping station will have hydraulic capacities, and is located at the confluence of the canal, and the Saigon River, with a river outfall discharge. 2) Drainage works to replace, and extend combined sewers to reduce overflows of storm-water, and wastewater. Includes dredging works for sludge transportation and disposal; cleaning inspection of secondary sewers; and, construction of tertiary sewers. Equipment will be procured to support institutional strengthening, and maintenance functions.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data