Hobson Rd Culvert Replacement
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Dodge
Scope of Work, Construction includes maintenance and reconstruction of drainage structure on Hobson Drive in Pickens County. The work will include removal and disposal of existing roadway and culvert items. Site grading and excavation. Stream Diversion and Pumping. Temporary Erosion control. Placement of new bottomless arch culvert with headwalls.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Jasper, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Hobson Rd Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of Work, Construction includes maintenance and reconstruction of drainage structure on Hobson Drive in Pickens County. The work will include removal and disposal of existing roadway and culvert items. Site grading and excavation. Stream Diversion and Pumping. Temporary Erosion control. Placement of new bottomless arch culvert with headwalls. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Jasper |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
