Hobson Way Resurfacing
Sector: Cement • Location: California, United States of America
Source: Riverside County
Limits: West Florence Boulevard to 2,680 feet east of De Frain Boulevard Length: Approximately 6,300 feet District: 4 Community: East Blythe
The County of Riverside Transportation Department is proposing to resurface approximately 6,300 feet of Hobson Way from West Florence Boulevard to 2,680 feet east of De Frain Boulevard. Hobson Way is classified as an Arterial Highway in the County of Riversi
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Limits: West Florence Boulevard to 2,680 feet east of De Frain Boulevard Length: Approximately 6,300 feet District: 4 Community: East Blythe The County of Riverside Transportation Department is proposing to resurface approximately 6,300 feet of Hobson Way from West Florence Boulevard to 2,680 feet east of De Frain Boulevard. Hobson Way is classified as an Arterial Highway in the County of Riversides General Plan. Hobson Way is a two lane road and currently ranges from 32-71 feet wide with curb/gutter and dike along various segments of the roadway. The proposed project will include removing the roadway (from West Florence Boulevard to 900 feet east of East Florence Boulevard) and pulverizing the roadway (from 900 feet east of East Florence Boulevard to 2,680 feet east of De Frain Boulevard) followed by placing back or overlaying with Hot Mix Asphalt (HMA). Additional improvements include: Reconstruction of concrete cross gutter, spandrel, and ADA deficient curb ramp Reconstruction of asphalt concrete dike and overside drain Construction of asphalt concrete driveway Placement of safety edge and shoulder backing Utility adjustments Striping of roadway, including pavement markers and reflectors Salvage/removal and installation of new signs No additional right-of-way will be required to construct the proposed improvements. The project improvements will be within the existing footprint of the roadway and will raise the existing roadway profile by 0.40 feet in the pulverize and overlay treatment areas. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
