Hoegh Gandria FSRU Conversion Project
Sector: LNG • Location: Sumed, Egypt
Source: Offshore-Energy
Conversion of the LNG carrier Hoegh Gandria into a floating storage and regasification unit (FSRU) for deployment in Egypt. The project involves installing a regasification module onboard the vessel, which was purchased in February 2023 for this upgrade. The conversion is scheduled to be completed by Q4 2026, with the FSRU to be deployed at Egypt's port of Sumed to replace the Hoegh Galleon.
- Status
- Under Construction
- Sector
- LNG, Natural Gas
- Location
- Sumed, Egypt
- Updated
- 22 Jul 2026
- Source
- Offshore-Energy
ConstructChat
Ask ConstructChat about Hoegh Gandria FSRU Conversion Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Conversion of the LNG carrier Hoegh Gandria into a floating storage and regasification unit (FSRU) for deployment in Egypt. The project involves installing a regasification module onboard the vessel, which was purchased in February 2023 for this upgrade. The conversion is scheduled to be completed by Q4 2026, with the FSRU to be deployed at Egypt's port of Sumed to replace the Hoegh Galleon. |
Original sector | Energy |
Location
Country | Egypt |
City | Sumed |
Source
Source | Offshore-Energy |
URL |
More Details
Record type | Project |
Sector | LNG, Natural Gas |
Article published date | 2025-06-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
