Holland Sylvania Road Area Water Main Replacement
Sector: Water Supply and Storage • Location: Toledo, Ohio, United States of America
Source: Dodge USA
The proposed work consists of the construction of approximately 9532 feet of 8" Ductile Iron Waterline, polyethylene wrapped (Standard Pressure Class 350) or PVC C-900 DR18 Waterline , 94 feet of 8 Ductile Iron Waterline Directionally Drilled, (Class 52 polyethylene wrapped), 8" Main Lines Valves, 8 and 12 Tapping Sleeve and Valves, Reconnection of Existing Water Service Taps, Manholes, Hydrant As
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Metal, Chemical (Industrial), Government, Steel, Commercial, Manufacturing (Industrial)
- Location
- Toledo, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Holland Sylvania Road Area Water Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed work consists of the construction of approximately 9532 feet of 8" Ductile Iron Waterline, polyethylene wrapped (Standard Pressure Class 350) or PVC C-900 DR18 Waterline , 94 feet of 8 Ductile Iron Waterline Directionally Drilled, (Class 52 polyethylene wrapped), 8" Main Lines Valves, 8 and 12 Tapping Sleeve and Valves, Reconnection of Existing Water Service Taps, Manholes, Hydrant Assemblies, Video Taping, connection to existing waterlines, labor and equipment, and all other nec... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Toledo |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Metal, Chemical (Industrial), Government, Steel, Commercial, Manufacturing (Industrial) |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
