Holley Ferry-Spann Road Water Improvements Phase II
Sector: Commercial • Location: Saluda, South Carolina, United States of America
Source: Dodge USA
Phase II Contract 1 - Water Main Extension Construction, Contract 2 Elevated Storage Tank Construction, Contract 3 Corley Bridge Booster Pump Station Construction, Contract 4 Hwy 39 Booster Pump Station Construction The Project consists of the construction of a 700 gpm booster pump station on Highway 39 to serve SCWSA and Ridge Spring. The project shall include all sitework, piping, fittings, valv
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Bridge, Power Generation (CCGT), Road, Government
- Location
- Saluda, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Holley Ferry-Spann Road Water Improvements Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Phase II Contract 1 - Water Main Extension Construction, Contract 2 Elevated Storage Tank Construction, Contract 3 Corley Bridge Booster Pump Station Construction, Contract 4 Hwy 39 Booster Pump Station Construction The Project consists of the construction of a 700 gpm booster pump station on Highway 39 to serve SCWSA and Ridge Spring. The project shall include all sitework, piping, fittings, valves, equipment, buildings, electrical, controls, appurtenances, and other items required for a com... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Saluda |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Bridge, Power Generation (CCGT), Road, Government |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
