HOLLY SPRINGS PEDESTRIAN IMPROVEMENTS
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Georgia Department of Transportation (GDOT)
CS 815/Railroad St @ 1 Loc & CS 830/CS 858/ Bowers St @ 1 Loc: Located in the City of Holly Springs, Cherokee County, GA. The purpose of this project is to provide a continuous sidewalk system within the City of Holly Springs, along Holly Springs Parkway and Hickory Road (excluding existing sidewalks). Also, to provide pedestrian lighting within the same project limits as PI 0008961, as well as cu
- Status
- Closed
- Sector
- Manufacturing (Industrial), Car parking, Rail, Road, Government, Automotive
- Location
- Holly Springs, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about HOLLY SPRINGS PEDESTRIAN IMPROVEMENTS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | CS 815/Railroad St @ 1 Loc & CS 830/CS 858/ Bowers St @ 1 Loc: Located in the City of Holly Springs, Cherokee County, GA. The purpose of this project is to provide a continuous sidewalk system within the City of Holly Springs, along Holly Springs Parkway and Hickory Road (excluding existing sidewalks). Also, to provide pedestrian lighting within the same project limits as PI 0008961, as well as curbs and gutters. The extent of this project is as follows: 1. Both sides of Holly Springs Parkway from Childers Road to Crossroads High/Middle School for an approximate length of roadway of 4200 feet. 2. North side of Hickory Road from Palm Street to the future access road to the industrial park, which will be located approximately 500 feet west from the intersection with Hickory Springs Industrial Drive, for an approximate roadway length of 1400 feet. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Holly Springs |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Car parking, Rail, Road, Government, Automotive |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
