logo

Holtec SMR-300 Deployment in Rwanda

Sector: Power Generation (CCGT) • Location: Rwanda

Source: Enlit World

Project
Planned

Holtec International and the Rwanda Atomic Energy Board (RAEB) have signed a Development Agreement to advance the deployment of Holtec’s SMR-300 in Rwanda, aiming for a potential total capacity of up to approximately 5 GW to support reliable baseload power without carbon emissions.

Status
Prospective
Sector
Power Generation (CCGT), Nuclear, Education
Location
Rwanda
Updated
22 Jul 2026
Source
Enlit World

ConstructChat

Ask ConstructChat about Holtec SMR-300 Deployment in Rwanda

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Holtec SMR-300 Deployment in Rwanda” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Rwanda. Taiyo aggregates data on it from Enlit World.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Holtec International and the Rwanda Atomic Energy Board (RAEB) have signed a Development Agreement to advance the deployment of Holtec’s SMR-300 in Rwanda, aiming for a potential total capacity of up to approximately 5 GW to support reliable baseload power without carbon emissions.

Original sector

Generation

Location

Country

Rwanda

Source

Source

Enlit World

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Nuclear, Education

Article published date

2026-05-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project