HOLVEN 800 BOYLSTON ST
Open · Massachusetts
Source: City of Boston
Replacement of an interior existing seasonal Boston Duck Tours kiosk at the Prudential Center. No new utility work is required and there are no structural elements. Kiosk will be constructed from fire retardent plywood and fabricated off-site and trucked in (no on site work).
- Status
- Prospective
- Sector
- Power Transmission, Power Generation (CCGT), Commercial, Government
- Location
- BOSTON, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about HOLVEN 800 BOYLSTON ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Replacement of an interior existing seasonal Boston Duck Tours kiosk at the Prudential Center. No new utility work is required and there are no structural elements. Kiosk will be constructed from fire retardent plywood and fabricated off-site and trucked in (no on site work). |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | BOSTON |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
