Home Depot - Fire Pump Room - Carmichael, CA
Sector: Water Supply and Storage • Location: Carmichael, California, United States of America
Source: Dodge USA
Project scope shall include the alteration of a fire suppression system to an existing home depot store. Work is to include, but not limited to, the addition of an exterior fire pump room, fire pump and water break tank. No additional interior or occupied square footage added to means of egress of the store.
- Status
- Closed
- Sector
- Water Supply and Storage, Residential, Commercial, Manufacturing (Industrial)
- Location
- Carmichael, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Home Depot - Fire Pump Room - Carmichael, CA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Sub Bidding, Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project scope shall include the alteration of a fire suppression system to an existing home depot store. Work is to include, but not limited to, the addition of an exterior fire pump room, fire pump and water break tank. No additional interior or occupied square footage added to means of egress of the store. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Carmichael |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Residential, Commercial, Manufacturing (Industrial) |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
