Homeless Shelter
Sector: Power Generation (CCGT) • Location: Tulare, California, United States of America
Source: Dodge USA
The work to be done consists of the clearing, grubbing, and demolition of the open lot on E O Neal Ave, 400 east of S K St in Tulare for the construction of an emergency homeless shelter. The project consists of on-site improvements including: concrete flatwork, parking, site drainage, landscaping, fencing, electrical, block wall, storm drain, water, sanitary sewer, and fire protection. Furnishmen
- Status
- Closed
- Sector
- Power Generation (CCGT), Cement, Car parking, Government, Water Supply and Storage, Waste Processing and Treatment, Residential, Automotive, Manufacturing (Industrial), Commercial
- Location
- Tulare, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Homeless Shelter
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be done consists of the clearing, grubbing, and demolition of the open lot on E O Neal Ave, 400 east of S K St in Tulare for the construction of an emergency homeless shelter. The project consists of on-site improvements including: concrete flatwork, parking, site drainage, landscaping, fencing, electrical, block wall, storm drain, water, sanitary sewer, and fire protection. Furnishment and permanent installation of modular units for office space, food pantry, laundry, classroom, ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Tulare |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Cement, Car parking, Government, Water Supply and Storage, Waste Processing and Treatment, Residential, Automotive, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
