logo

Honda Electric Semi Pilot Project

Sector: Automotive • Location: Lincoln, Alabama, United States

Source: The Cool Down

Project
Under Construction

Honda is testing an all-new electric semi truck, the Peterbilt 579EV, at its assembly plant in Lincoln, Alabama. This electric workhorse is designed to transport Honda cars to a nearby rail depot, capable of carrying 82,000 pounds and covering 150 miles on a single charge. The project aims to explore the use of electric vehicles in large company fleets, contributing to reduced environmental impact

Status
Under Construction
Sector
Automotive, Rail, Power Generation (CCGT), Electric Vehicles (EVs), Commercial, Warehouse
Location
Lincoln, Alabama, United States of America
Updated
22 Jul 2026
Source
The Cool Down

ConstructChat

Ask ConstructChat about Honda Electric Semi Pilot Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Honda Electric Semi Pilot Project” is an infrastructure initiative in the Automotive sector, located in Lincoln, Alabama, United States. Taiyo aggregates data on it from The Cool Down.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Honda is testing an all-new electric semi truck, the Peterbilt 579EV, at its assembly plant in Lincoln, Alabama. This electric workhorse is designed to transport Honda cars to a nearby rail depot, capable of carrying 82,000 pounds and covering 150 miles on a single charge. The project aims to explore the use of electric vehicles in large company fleets, contributing to reduced environmental impact and operational costs.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Alabama

City

Lincoln

Source

Source

The Cool Down

URL

More Details

Record type

Project

Sector

Automotive, Rail, Power Generation (CCGT), Electric Vehicles (EVs), Commercial, Warehouse

Article published date

2025-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project