logo

Honduras Gensets Conversion

Sector: Oil and Gas • Location: Guyana

Source: Stabroek News

Project
Under Construction

APAN Energy is converting 18 used generators from Honduras to meet the specifications required by Guyana Power and Light Inc (GPL). The conversion is expected to be completed by the end of March 2025, with the generators being tested for a switch from intermediate fuel oil to heavy fuel oils.

Status
Under Construction
Sector
Oil and Gas, Power Generation (CCGT)
Location
Guyana
Updated
22 Jul 2026
Source
Stabroek News

ConstructChat

Ask ConstructChat about Honduras Gensets Conversion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Honduras Gensets Conversion” is an infrastructure initiative in the Oil and Gas sector, located in Guyana. Taiyo aggregates data on it from Stabroek News.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

APAN Energy is converting 18 used generators from Honduras to meet the specifications required by Guyana Power and Light Inc (GPL). The conversion is expected to be completed by the end of March 2025, with the generators being tested for a switch from intermediate fuel oil to heavy fuel oils.

Location

Country

Guyana

Source

Source

Stabroek News

URL

More Details

Record type

Project

Sector

Oil and Gas, Power Generation (CCGT)

Article published date

2025-03-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project