logo
ProjectClosed

Hood River River Waterfront Stormline Relocation Phase 4

Closed · Oregon · Last reported Jul 2025

Source: Dodge

The work to be done under this contract consists of constructing 450 lineal feet of 36-inch storm drain complete with rip rap splash pad and grated inlet, and four 60-inch diameter manholes. Constructing channels and grading within a wetland area, constructing temporary access road adjacent to a wetland area, abandoning in-place two culverts under the interstate I-84 freeway, installing conduit fo

Status
Closed
Sector
Water Supply and Storage, Government, Road, Power Generation (CCGT), Waste Processing and Treatment, Commercial
Location
Hood River, Oregon, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Hood River River Waterfront Stormline Relocation Phase 4

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Hood River River Waterfront Stormline Relocation Phase 4” is an infrastructure initiative in the Water Supply and Storage sector, located in Hood River, Oregon, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work to be done under this contract consists of constructing 450 lineal feet of 36-inch storm drain complete with rip rap splash pad and grated inlet, and four 60-inch diameter manholes. Constructing channels and grading within a wetland area, constructing temporary access road adjacent to a wetland area, abandoning in-place two culverts under the interstate I-84 freeway, installing conduit for re-routed underground communications and electric lines, installing temporary erosion and sedim...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Oregon

City

Hood River

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Road, Power Generation (CCGT), Waste Processing and Treatment, Commercial

Article published date

2025-08-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project