Hood River River Waterfront Stormline Relocation Phase 4
Closed · Oregon · Last reported Jul 2025
Source: Dodge
The work to be done under this contract consists of constructing 450 lineal feet of 36-inch storm drain complete with rip rap splash pad and grated inlet, and four 60-inch diameter manholes. Constructing channels and grading within a wetland area, constructing temporary access road adjacent to a wetland area, abandoning in-place two culverts under the interstate I-84 freeway, installing conduit fo
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Road, Power Generation (CCGT), Waste Processing and Treatment, Commercial
- Location
- Hood River, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Hood River River Waterfront Stormline Relocation Phase 4
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be done under this contract consists of constructing 450 lineal feet of 36-inch storm drain complete with rip rap splash pad and grated inlet, and four 60-inch diameter manholes. Constructing channels and grading within a wetland area, constructing temporary access road adjacent to a wetland area, abandoning in-place two culverts under the interstate I-84 freeway, installing conduit for re-routed underground communications and electric lines, installing temporary erosion and sedim... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Hood River |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Power Generation (CCGT), Waste Processing and Treatment, Commercial |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
