Hooksett Toll Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Maine Public
The Hooksett tolls on Interstate-93 will be closed for two months starting in April for the replacement of outdated equipment including cameras, sensors, and computer servers. This closure is necessary as the current equipment, installed in 2013, has reached its limit.
- Status
- Prospective
- Sector
- Road
- Location
- Hooksett, New Hampshire, United States of America
- Updated
- 19 Nov 2026
- Source
- Maine Public
ConstructChat
Ask ConstructChat about Hooksett Toll Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Hooksett tolls on Interstate-93 will be closed for two months starting in April for the replacement of outdated equipment including cameras, sensors, and computer servers. This closure is necessary as the current equipment, installed in 2013, has reached its limit. |
Location
Country | United States of America (USA) |
State | New Hampshire |
City | Hooksett |
Source
Source | Maine Public |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States
- Fort Hood Military Base, Texas
- Grand Forks Air Force Base, North Dakota
- Ellsworth Air Force Base (IATA: RCA), South Dakota
- Shaw Air Force Base
- Beaumont Refinery Expansion, Texas
- Dakota Prairie Refinery, Stark County, North Dakota
- Monkey Island LNG Terminal, Louisiana
- Bayou Bridge Pipeline Project, Louisiana
