Hoover Dam Turbine Replacement Project
Sector: Hydro • Location: United States
Source: Heatmap News
The Trump administration is funding a $52 million project to replace up to three older turbines at the Hoover Dam with new wide-head turbines designed to operate efficiently at lower water levels. This upgrade aims to restore at least 160 megawatts of hydropower capacity as water levels in Lake Mead drop due to drought and increased water demand.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Trump administration is funding a $52 million project to replace up to three older turbines at the Hoover Dam with new wide-head turbines designed to operate efficiently at lower water levels. This upgrade aims to restore at least 160 megawatts of hydropower capacity as water levels in Lake Mead drop due to drought and increased water demand. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
