Hopkins SCR Catalyst Replacement
One of 10,000+ projects Taiyo tracks in Florida.
Source: Dodge
The City of Tallahassee owns and operates seven (7) Wartsila reciprocating engines, each equipped with its own emissions control system. Over time, the catalyst bricks within these systems degrade and require replacement. This request for bids is for the removal and installation of catalyst bricks for the Hopkins Generating Station and Substation 12 reciprocating engines. Hopkins Generating Statio
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Government
- Location
- Tallahassee, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Hopkins SCR Catalyst Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of Tallahassee owns and operates seven (7) Wartsila reciprocating engines, each equipped with its own emissions control system. Over time, the catalyst bricks within these systems degrade and require replacement. This request for bids is for the removal and installation of catalyst bricks for the Hopkins Generating Station and Substation 12 reciprocating engines. Hopkins Generating Station operates five (5) Wartsila 18V50SG reciprocating engines, each with its own emissions system re... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Tallahassee |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
