Horizon Baking Company Alteration
Sector: Water Supply and Storage • Location: Columbus, Ohio, United States of America
Source: Dodge
New Horizon Baking Company Pancake Line 15,280 s.f. alteration in existing 144,546 s.f. bakery building for two new bakery areas with make-up and packaging entrances, office, packaging and storage rooms. Plumbing includes new gas-fired WH, industrial hose station and sinks. Also new product water lines are provided for equipment. HVAC includes two new gas-fired RTUs on roof, two gas-fired MUA unit
- Status
- Prospective
- Sector
- Water Supply and Storage, Residential, Commercial, Manufacturing (Industrial)
- Location
- Columbus, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Horizon Baking Company Alteration
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | New Horizon Baking Company Pancake Line 15,280 s.f. alteration in existing 144,546 s.f. bakery building for two new bakery areas with make-up and packaging entrances, office, packaging and storage rooms. Plumbing includes new gas-fired WH, industrial hose station and sinks. Also new product water lines are provided for equipment. HVAC includes two new gas-fired RTUs on roof, two gas-fired MUA units on roof, exhaust fans and mini splits in the offices. Elec includes new 4000A MDPS section to e... |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Columbus |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Residential, Commercial, Manufacturing (Industrial) |
Article published date | 2025-08-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
