Horizon Lakes Infrastructure Development Plans Phase 1 REBID
Sector: Water Supply and Storage • Location: Allen, Texas, United States of America
Source: Dodge USA
Deelopment Plans for Horizon Lakes Infrastructure Phase 1, to serve the master Infrastructure for Horizon Lakes - Earthwork, Erosion Control, Pavement, and Utilities.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Government, Waste Processing and Treatment, Road, Power Transmission, Power Generation (CCGT)
- Location
- Allen, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Horizon Lakes Infrastructure Development Plans Phase 1 REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Deelopment Plans for Horizon Lakes Infrastructure Phase 1, to serve the master Infrastructure for Horizon Lakes - Earthwork, Erosion Control, Pavement, and Utilities. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Allen |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government, Waste Processing and Treatment, Road, Power Transmission, Power Generation (CCGT) |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
