Hosaf Shahjibazar Rental Power Plant
Sector: Power Generation (CCGT) • Location: Bangladesh
Source: World Bank Group
Energy Prima Limited (EPL), subsidiary of Hosaf Group, operated the 50MW Shahjibazar rental power plant which became operational in November 2008.
The project consisted of 29 gas engines. Contract length was 3 years.
Total cost was US$11.8 million, based on US$600k per MW, for 3 years at 10% interest. The project was still operational in December 2012.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Government, Natural Gas
- Location
- Bangladesh
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Hosaf Shahjibazar Rental Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Energy Prima Limited (EPL), subsidiary of Hosaf Group, operated the 50MW Shahjibazar rental power plant which became operational in November 2008. The project consisted of 29 gas engines. Contract length was 3 years. Total cost was US$11.8 million, based on US$600k per MW, for 3 years at 10% interest. The project was still operational in December 2012. http://www.hosafgroup.com/epl.html http://www.energyprima.com/project.php |
Original sector | Energy |
Budget |
Location
Country | Bangladesh |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Natural Gas |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
